Turn Waste Into Electricity Through Continuous Improvement

Turn Waste Into Electricity Through Continuous Improvement

Process improvement can be the difference between exceeding expectations and failing. For Renewi, generating 450,000 tonnes of municipal waste into electricity required incremental process change and developing a culture of continuous improvement. This was part of an operational cost saving of £3.8m in 24 months.

Turn Waste to Electricity

Virtual Benchmark Visit at Renewi

4th March 2021  | 17:00 (GMT)

Save Your Spot Here

Recent Posts

 

Newsletter

Get all the latest news about Kaizen Institute. Subscribe now.

* required fields

arrow up